Planned downtime

Category: Planned downtime
Last updated: Wednesday, August 15, 2018 - 3:39pm
ACCC will be performing network maintenance on Tuesday, August 14th, from 7:00pm to 9:00pm in order to move VLANs (Virtual Local Area Networks) off of old routers. Please be aware that brief network service interruptions may occur during this
Category: Planned downtime
Last updated: Tuesday, August 14, 2018 - 7:26pm
ACCC will be performing network switch maintenance on Tuesday, August 14th, at 7:00pm. At this time, Wired, Wireless, and VoIP connectivity may be disrupted for up to 15 minutes at the following locations
Category: Planned downtime
Last updated: Tuesday, August 14, 2018 - 12:54pm
ACCC will be performing maintenance on Echo360 for a security certificate renewal on Monday, August 13th, from 7:00am to 7:30am. Echo360 will be unavailable during this maintenance time frame. If you have any questions, please feel
Category: Planned downtime
Last updated: Friday, August 10, 2018 - 1:02pm
ACCC will be reconfiguring network paths to utilize new faster network uplinks on Thursday, August 9th, from 7:00pm to 11:00pm. Please be aware that brief service interruptions may occur during this maintenance time frame, including wireless
Category: Planned downtime
Last updated: Friday, August 3, 2018 - 1:46pm
August 17th - 19th Planned Downtime Schedule ACCC Maintenance Window Dear Students, Faculty and Staff, Please note that ACCC’s next quarterly maintenance window is from Friday, August 17th at 5:00pm
Category: Planned downtime
Last updated: Thursday, July 26, 2018 - 4:20pm
ACCC will be upgrading its equipment lending system, Webcheckout, August 13th - 17th. This upgrade is scheduled to happen during an academic break period when the equipment lending service
Category: Planned downtime
Last updated: Friday, July 6, 2018 - 6:49pm
Blackboard will be performing system updates on Thursday, July 5th from 11:00pm to 5:00am CDT. Blackboard may be unavailable during this time. If you have
Category: Planned downtime
Last updated: Tuesday, July 3, 2018 - 8:36am
Network maintenance will be performed in PEB (Physical Education Building) and FAC (Flames Athletic Center) on Friday, June 29, from 6:00am to 3:00pm. All network access, including VOIP telephones, wireless, and wired access will be
Category: Planned downtime
Last updated: Saturday, June 30, 2018 - 8:49am
ACCC will be upgrading CrashPlan (Code42) to version 6.7.2 on Friday, June 29 from 11:00PM to 11:45PM. Backups for current users will continue to run and will not be impacted during this time frame. However, no new users will be able to be
Category: Planned downtime
Last updated: Monday, June 18, 2018 - 12:42pm
ACCC will replace an expiring SSL certificate for WebEx Teams (Spark) on Saturday, June 16 from 10:00am to 11:00am. Login access may fail during this maintenance time frame. Please send any questions or comments you have to ACCC
Category: Planned downtime
Last updated: Monday, June 18, 2018 - 12:07pm
ACCC will be performing router maintenance on Tuesday, June 12, (West Campus) from 7:00pm to 10:00pm and Thursday, June 14, (East Campus) from 7:00pm to 10:00pm. Total downtime for each building should be brief (less than 5 minutes). Services
Category: Planned downtime
Last updated: Tuesday, May 22, 2018 - 9:14am
Please note that ACCC’s next quarterly maintenance window is from Friday, May 18th at 9:30pm through Sunday, May 20th at 11:59pm. ACCC maintenance windows are scheduled to have the least impact on UIC operations, and downtime for services is
Category: Planned downtime
Last updated: Monday, May 21, 2018 - 6:31pm
Saturday, May 19th Update Network Maintenance - Between 11:00am and 5:00pm maintenance will be performed on the wireless network (east and west campus) and Office 365 (including Outlook email). Any outages are expected
Category: Planned downtime
Last updated: Monday, May 21, 2018 - 3:34pm
ACCC will be performing maintenance to the analog phone services for Nursing and West Campus Dorms on Friday, May 18, from 9:30pm to 10:00pm. Analog phone services will be unavailable during this maintenance timeframe. If you have
Category: Planned downtime
Last updated: Monday, April 2, 2018 - 12:46pm
ACCC will be updating the ADSM-2 server on Monday, March 26 from 1:00PM to 5:00PM, and on Friday, March 30 from 1:00PM to 5:00PM. You can tell which ADSM server you are assigned to on your daily backup results email, or
Category: Planned downtime
Last updated: Monday, March 26, 2018 - 1:39pm
Please note that ACCC’s next quarterly maintenance window is from Friday, March 23rd at 6:00pm through Sunday, March 25th at 6:00pm. ACCC maintenance windows are scheduled to have the least impact on UIC operations, and downtime for services
Category: Planned downtime
Last updated: Friday, March 23, 2018 - 1:53pm
On Thursday, March 22nd, Lynda.com engineers will perform site maintenance on the Lynda.com database to improve performance. The website will be down for a maximum of one hour between the hours of 11:00pm and 2:00am CT. If you encounter any
Category: Planned downtime
Last updated: Friday, March 16, 2018 - 10:37am
ACCC will be moving Hospital network connections to faster connections on Wednesday, March 14, from 12:01am to 1:00am. During the scheduled window the Hospital connectivity will be impacted. We apologize for the inconvenience. If you
Category: Planned downtime
Last updated: Friday, March 9, 2018 - 1:58pm
Blackboard will be performing maintenance on the Blackboard SafeAssign servers Thursday, March 8, from 2:00am to 8:00am. During this time, SafeAssign will be unavailable to accept papers and any student submissions made during this period will
Category: Planned downtime
Last updated: Tuesday, January 16, 2018 - 1:15pm
ACCC will be performing an emergency update on VMware servers on Friday, January 12, from 10:00pm to Saturday, January 13, 1:00am. The following services will be impacted and unavailable during this

Pages